HOME > 상세정보

상세정보

Network scheduling techniques for construction project management

Network scheduling techniques for construction project management (2회 대출)

자료유형
단행본
개인저자
Hajdu, Miklos, Ph.D.
서명 / 저자사항
Network scheduling techniques for construction project management / by Miklos Hajdu.
발행사항
Dordrecht ;   Boston, Mass :   Kluwer Academic,   c1997.  
형태사항
xii, 333 p. : ill. ; 25 cm.
총서사항
Nonconvex optimization and its applications ;v. 16
ISBN
0792343093 (hardbound : alk. paper)
서지주기
Includes bibliographical references (p. [323]-327) and index.
일반주제명
Industrial project management. Network analysis (Planning) Scheduling.
000 00906camuuu200265 a 4500
001 000000565748
003 OCoLC
005 19970924155247.0
008 961104s1997 ne a b 001 0 eng
010 ▼a 96037406 //r97
020 ▼a 0792343093 (hardbound : alk. paper)
040 ▼a DLC ▼c DLC
049 ▼a ACSL ▼l 121031014
050 0 0 ▼a T56.8 ▼b .H34 1997
082 0 0 ▼a 658.4/04 ▼2 21
090 ▼a 658.404 ▼b H154n
100 1 ▼a Hajdu, Miklos, ▼c Ph.D.
245 1 0 ▼a Network scheduling techniques for construction project management / ▼c by Miklos Hajdu.
260 ▼a Dordrecht ; ▼a Boston, Mass : ▼b Kluwer Academic, ▼c c1997.
300 ▼a xii, 333 p. : ▼b ill. ; ▼c 25 cm.
440 0 ▼a Nonconvex optimization and its applications ; ▼v v. 16
504 ▼a Includes bibliographical references (p. [323]-327) and index.
650 0 ▼a Industrial project management.
650 0 ▼a Network analysis (Planning)
650 0 ▼a Scheduling.

소장정보

No. 소장처 청구기호 등록번호 도서상태 반납예정일 예약 서비스
No. 1 소장처 과학도서관/Sci-Info(2층서고)/ 청구기호 658.404 H154n 등록번호 121031014 (2회 대출) 도서상태 대출가능 반납예정일 예약 서비스 B M

컨텐츠정보

책소개

Industrial, financial, commercial or any kinds of project have at least one common feature: the better organized they are, the higher the profit or the lower the cost. Project management is the principle of planning different projects and keeping them on track within time, cost and resource constraints. The need for effective project management is ever-increasing. The complexity of the environment we live in requires more sophisticated methods than it did just a couple of decades ago. Project managers might face insurmountable obstacles in their work if they do not adapt themselves to the changing circumstances. On the other hand, better knowledge of project management can result in better plans, schedules and, last but not least, more contracts and more profit. This knowledge can help individuals and firms to stay alive in this competitive market and, in the global sense, utilize the finite resources of our planet in a more efficient way.

Industrial, financial, commercial or any kinds of project have at least one common feature: the better organized they are, the higher the profit or the lower the cost. Project management is the principle of planning different projects and keeping them on track within time, cost and resource constraints. The need for effective project management is ever-increasing. The complexity of the environment we live in requires more sophisticated methods than it did just a couple of decades ago. Project managers might face insurmountable obstacles in their work if they do not adapt themselves to the changing circumstances. On the other hand, better knowledge of project management can result in better plans, schedules and, last but not least, more contracts and more profit. This knowledge can help individuals and firms to stay alive in this competitive market and, in the global sense, utilize the finite resources of our planet in a more efficient way.


정보제공 : Aladin

목차

Preface. 1. Introduction. 2. CPM Scheduling. 3. CPM Least Cost Scheduling. 4. Precedence Diagramming. 5. Advanced Precedence Diagramming. 6. Precedence Diagramming with Bounded Activity Duration. 7. PDM Least Cost Scheduling. 8. Resources in Scheduling. 9. Art of Scheduling. Appendix A: Mathematical Basis. Appendix B: Computer Applications. Bibliography. Index.


정보제공 : Aladin

관련분야 신착자료

김홍탁 (2026)